Specialized acrylic tape (3.75" or wider) or Liquid Flash. Exposure: Panels can remain exposed for up to 180 days. 2. Installation Procedures (Wall Sheathing)
Use standard nails or screws, ensuring they are driven flush. Avoid overdriving (where the head is more than halfway through the panel), which can cause structural issues.
Crucial Step: Use a ZIP System Tape Roller (or J-roller) to apply pressure, ensuring a strong bond. The roller will leave an embossed "Z" pattern on the tape, indicating proper pressure. Part 2- Outdoor zip
Install panels with the moisture-resistant barrier facing outward. Orient long edges (
Look for "Z" marks indicating the tape has been rolled. Specialized acrylic tape (3
To make this report more useful for your specific site, could you tell me: Are you using standard tape or the liquid flash system? What type of exterior cladding (siding) will be installed?
This report details the installation, inspection, and best practices for the (wall and roof sheathing), aimed at creating a high-performance, airtight, and watertight building envelope. 1. Project Overview & Objective The roller will leave an embossed "Z" pattern
If installing stucco, an additional water-resistive barrier (WRB) might be required, though the system itself is an approved WRB.